Velocity Melbourne Trains Project
The Velocity Melbourne Trains Project was a fast-paced and technically demanding assignment that enabled our team to demonstrate advanced capability across electrical and mechanical design. Engaged as subcontractors, we were responsible for delivering a full 3D electrical layout for a train compartment featuring a fully equipped onboard kitchen. Working in close collaboration with Ricardo, the lead electrical contractor, we delivered a refined and installation-ready solution within tight project timelines.
Scope & Objectives
Our brief focused on designing and coordinating:
A complete 3D electrical layout for the compartment
Appliance-ready power distribution for the kitchen area
Routing for all wiring and fluid piping
Sheet-metal redesign of the pantry
Installation documentation and visual diagrams
The challenge lay in integrating multiple complex systems within a confined space while ensuring safety, serviceability, and compatibility with the overall train design.
Electrical Design Excellence
3D Electrical Layout
We developed a comprehensive electrical system layout for the compartment, with particular attention to the appliance-heavy kitchen zone. Our design ensured:
Safe and efficient power distribution
Optimal placement of electrical components
Compliance with industry standards and contractor requirements
Connection & Routing Diagrams
To support installation teams, we produced:
Clear connection diagrams detailing how each component interfaces
Wire routing paths modelled in 3D to ensure efficient cable management, minimise interference, and maximise accessibility
Step-by-step visual installation diagrams that significantly accelerated onsite implementation
Mechanical Enhancements
Beyond the electrical scope, we contributed key mechanical design improvements:
Pantry Redesign (Sheet Metal)
We redesigned the kitchen pantry using sheet-metal principles to enhance:
Space utilisation
Accessibility
Integration with the train’s interior aesthetic
3D Piping Flow System
Using SolidWorks routing, we modelled the entire piping system supplying water and other fluids to the kitchen. By analysing and simulating flow paths, we eliminated potential performance issues before installation, ensuring a stable and efficient system.
Technology & Workflow
The entire project was executed in SolidWorks 3D, leveraging:
Routing tools for wiring and piping
Simulation and interference detection
Detailed 3D assemblies for design validation
Accurate installation diagrams generated from the model
This approach allowed us to detect issues early, optimise space usage, and deliver highly accurate construction-ready documentation.
Challenges & Solutions
Working to aggressive deadlines, coordination between multiple contractors was essential. We maintained real-time communication with Ricardo’s teams, aligning our designs through frequent updates. The confined nature of the train compartment also demanded meticulous 3D analysis. Using SolidWorks’ advanced tools, we refined the layout until every electrical and mechanical element integrated seamlessly.
Outcome
The Velocity Melbourne Trains Project is a strong example of our ability to deliver precision engineering under pressure. Our contribution—spanning electrical design, mechanical upgrades, routing, and documentation—played a crucial role in the successful delivery of the compartment’s functional systems.
This project highlights our strengths in collaboration, technical expertise, and efficient, high-quality delivery.