REPAIR DRAWINGS FOR ALEXANDRIA BRIDGE AT RICKETTY STREET FOR SYDNEY TRANSPORT.

At Ricketty Street, Mascot.

1 min read

This month we completed bridge rework as-built drawings for the bridge at Ricketty Street, Mascot.
Which included bridge drawings with all required details showing concrete work and data of work performed for project submission and documentation.

Leave a Reply

Your email address will not be published.

Previous Story

DESIGN OF MAXI, SPEED 35-40 TRAY/MIN DEPOSITOR FOR CHURCH AND VITE M301S, SWING HOPPER DEPOSITOR FOR NATURES PRODUCT WITH NID PTY LTD.

Next Story

MACARTHUR COWPASTURE BRIDGE REPAIR DRAWINGS

Latest from Blog