DESIGN OF M301S, SWING HOPPER DEPOSITOR FOR INTERPACK WITH NID PTY LTD

1 min read

Our involves was in designing depositors based on projects which consists of,
• Small machines (R&D) project designing.

Major part of projects based on designing depositors consists of
• Structural design
• Preparing geometry of mechanisms and
• Producing manufacturing drawings.

Tools and skills used,
• Solidworks (Part, Assembly, Sheet metal, Weldment, Drawing, Simulation)
• AutoCAD (2d drawings)

Achievements:

Implementing Australian standards religiously on all drawings made design more universal and simple to design and manucturing team, resulting an increase in production speed.

Leave a Reply

Your email address will not be published.

Previous Story

REDESIGN OF BM SERIES 7 TRUCK AT ORICA MINING SERVICE

Next Story

DESIGN OF MAXI, SPEED 35-40 TRAY/MIN DEPOSITOR FOR CHURCH AND VITE WITH NID PTY LTD.

Latest from Blog