REDESIGN OF BM SERIES 7 TRUCK AT ORICA MINING SERVICE

1 min read

Our service included:

  1. Preparing Piping and Instrumental Diagrams for hydraulic and electric schematic using AutoCAD.
  2. Redesign of BM Series 7 project at Mobile Manufacturing Unit involved in modeling and drafting using SolidWorks:
    • Bulk Master’s Auger and Auger Mounts with considering proper stress analysis using SolidWorks simulation.
    • ANE pump with mounts and pipe run around mobile unit using SW routing tool.
    • Hydraulic and Pneumatic tanks layout design using sheet metal tool.
    • Positioning of tanks, pumps and bin and all possible mountings at chassis with hopper and hydraulic piping redesign.

The training we took for this project:

  • Enterprise Product Data Management (EPDM)
  • Safety Health and Environment Study
  • Orica site safety, Product knowledge.
  • SAP (Special Assistance Plan)

Other achievements:

  • Designed to reduce weld in truck chassis mounting area by converting most of plates and structures to sheetmetal
  • FEA testing on mounts at design stage to confirm its rigidity and reliability.

Leave a Reply

Your email address will not be published.

Previous Story

BULK MATERIAL HANDLING PROJECT FOR NEPEAN CONVEYORS PROJECT WITH L.E. OTTON

Next Story

DESIGN OF M301S, SWING HOPPER DEPOSITOR FOR INTERPACK WITH NID PTY LTD

Latest from Blog