BLUESCOPE STEEL COKE PLANT NO.6 MAINTENANCE PROJECT WITH L.E. OTTON

1 min read

Our support involved in 3D modelling the furnace modification area and providing the installation and manufacturing drawing.
• Provide practical drafting and design solutions, which are complained to engineering standards.
• Design innovative solutions to industry requirements.
• Deliver strategic competitive advantages through design innovation.

Our responsibilities were

• The drawings being in accordance with the relevant standards.
• Accuracy of the drawings with respect to drafting/engineering solutions.
• Perform duties as instructed by the Project engineer.
• Document Control.
• Structural and piping detail drafting.

Leave a Reply

Your email address will not be published.

Previous Story

BLAST FURNACE MAINTENANCE PROJECT FOR ONE STEEL WHYALLA PROJECT WITH L.E. OTTON

Next Story

BLUESCOPE STEEL COKE PLANT NO.5 DESIGN PROJECT WITH L.E. OTTON

Latest from Blog