BLAST FURNACE MAINTENANCE PROJECT FOR ONE STEEL WHYALLA PROJECT WITH L.E. OTTON

1 min read

Our support involved in producing Installation drawings, layout modification and detail drafting.

• Quick drafting 40 to 60 drawings detailing per week.
• Ensure drawings being in accordance with the relevant standards.
• Maintain accuracy of the drawings with respect to drafting / engineering solutions.

Leave a Reply

Your email address will not be published.

Next Story

BLUESCOPE STEEL COKE PLANT NO.6 MAINTENANCE PROJECT WITH L.E. OTTON

Latest from Blog